|
© Copyright 2005,
Neptune Exploration &
Industries Limited,
All Rights Reserved.
|
|
| |
Foam Drilling &
Workover
The State of
Art Technology and infrastructure required is available with
the Company. The technology is used in the Circulation of
Foam in the well for removal of sand clay bridges and for
drilling out of cement bridges.
Foam are used in development of three-phase foam circulation
method including its pumping without breakdown and also for
well killing and plugging of lost circulation intervals at
high depth under high pressure and temperatures.
This technology proves very cost effective as there is a process
of foam generation as well as foam breaking and the same foam
may be used again. The technology is also environment friendly.
|
|
|
|